Berners Street - Aluminium Cladding installation

On this project B&V Installing Ltd has performed the Installation of Rainscreen System and Aluminium Cladding

Royal Warf Plot 12 - Aluminium Cladding installation

On this project B&V Installing Ltd has performed the Installation of Rainscreen System and Aluminium Cladding

Kensington Row Phase II - Block E, H (PMU)

On this project B&V Installing Ltd has performed the Installation of Rainscreen Cladding and Stone façade for the Performance Mock-up Unit.

Battersea Power Station – Arches Redevelopment

On this project B&V Installing Ltd has performed the installation  of the Wind posts, secondary substructure, CW Stickwork Façade, Metsec, Rainscreen and wooden louvers.

Glasgow Victoria Secret Shopfront and Stairs - Installation of steel structure, Shopfront Glazing and Staircase.

On this project B&V Installing Ltd has performed the installation of the of the steel structure, staircase and the Shopfront Glazing.

Royal Warf Plot 15 - Installation Aluminium Cladding, Balconies, Rainscreen And Terracotta

On this project B&V Installing Ltd has been involved in the installation of the Balconies Aluminium Cladding in Core A. Also actively participated in the installation of the Rainscreen system for the Terracota Cladding on the external facade.

Royal Albert Docks, Thorpe Factory - Windows installation, Mastic and Paint Repairs.

On this project B&V Installing Ltd has been involved in the installation of the windows to the concrete panels including application of mastic and paint repair of the damaged frames.

Thorpe Park - Leads shop front installation.

On the specific project B&V Installing Ltd has been involved in the installation of the planar system for the Next shop and part the of curtain walling package (stick work system).

Victoria's Secret - Milton Keynes shop front installation.

On the specific project B&V Installing Ltd has performed the installation of the entire steel structure, aluminium panels and glazing. Due to the specific requirements of the client all the works have been performed during nights and under an accelerated programme.

BPS1 - Installation of Arches, Curtain Wall, Stone Cladding and Balustrades.

On this project B&V Installing Ltd has been involved in the installation of almost all of the elements of the GF package, which comprised installation of Curtain Wall Cladding, Arches, Glass balustrades, Stone Cladding and Glass Replacement.

Cargreen Road - Installation of GRC Panels, Metsec and Balconies.

On this project B&V Installing Ltd was responsible for the installation of all the GRC panels on the external façade, Balconies' divisions and the metsec floor structure on top level.

Trinder Road - GRC panels installation.

On this project B&V Installing Ltd has performed the installation of the GRC panel on the Façade and around columns.

BPS1, Block E - Lift Shaft Cladding Installation

On this project B&V Installing Ltd has performed the installation of the Lift Shaft's Rain Screen System.

The Collective Oak - Mastic maintenance works and glass replacements.

On this project B&V Installing Ltd has performed mastic maintenance works  from the BMU cradle and glass replacements.